|
|
Matching Field Evaluations
|
Title: |
Chapman Companies |
|
Start Date: |
August 2000 |
|
End Date: |
October 2004 |
|
Builder: |
Mike Chapman |
|
Description: |
Field Evaluation of these technologies: Water conservation: Gray Water Reuse, Rainwater Harvesting, and Xeriscaping. Air Admittance Valves (AAVs). Final Report (dated October 2004) available as pdf. |
|
Technologies Evaluated: |
|
|
|
Title: |
Franklin Homes - The Vistas at Kensington Park |
|
Start Date: |
May 1999 |
|
End Date: |
July 2003 |
|
Builder: |
Carl Franklin Homes |
|
Description: |
Field Evaluation of these technologies: Concrete Floor Finish, Prefabricated Drywall Corners, Tankless Water Heater. Final Report (dated July 2003) available. |
|
Technologies Evaluated: |
|
|
-
Drywall Finishing Accessories
|
|
|
|
|
|
|
|
Title: |
Habitat for Humanity - Schenectady |
|
Start Date: |
May 2001 |
|
End Date: |
August 2003 |
|
Builder: |
Habitat for Humanity Schenectady |
|
Description: |
Field Evaluation of these technologies: Air Admittance Valves, Insulating Concrete Form (ICF), Metal Roofing, Radiant Floor Heating, Whole House Mechanical Ventilation. Final Report (dated August 2003) available as pdf. |
|
Technologies Evaluated: |
-
Radiant Floor Heating - Dry System Hydronic
|
|
|
|
|
|
Title: |
MADE Project |
|
Start Date: |
June 2000 |
|
End Date: |
March 2003 |
|
Builder: |
NAHB Research Center |
|
Description: |
Marketable, Affordable, Durable, Entry-level (MADE) single-family detached homes; Field Evaluation of these technologies: fiber-cement siding, standing seam metal roofs, tankless water heaters, precast concrete foundation walls. Final Report (dated July 2003) available as pdf. |
|
Technologies Evaluated: |
-
Precast Concrete Foundation and Wall Panels
|
-
New Generation OSB Sub-flooring
|
|
|
|
|
-
Structured Wiring Systems
|
|
|
|
|
|