|
|
Matching Field Evaluations
|
Title: |
J. W. Miller Companies - Armory Park del Sol |
|
Start Date: |
August 2000 |
|
End Date: |
April 2004 |
|
Builder: |
John Wesley Miller Companies |
|
Description: |
Field Evaluation of these technologies: Photovoltaic Electrical Generation, Solar with Tankless Water Heaters, Energy Efficient Building Construction, Zero Energy Home. Interim Report (dated April 2004) available as pdf. |
|
Technologies Evaluated: |
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
-
Full Spectrum Fluorescent Lamps
|
-
Photovoltaic (PV) Roofing
|
|
|
|
|
|
|
|
|
|
|
|
Title: |
Lancaster County Career & Technology Center (LCCTC) |
|
Start Date: |
December 2005 |
|
Estimated Completion Date |
June 2009 |
|
Builder: |
Lancaster County Career & Technology Center (LCCTC) |
|
Description: |
Built by students, with a focus on green building and PATH Technology items. |
|
Technologies Evaluated: |
-
Advanced Framing Techniques: Optimum Value Engineering (OVE)
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
|
|
-
Insulating Concrete Forms (ICF)
|
-
Insulation Alternatives: Sprayed Fiber Insulation
|
|
|
|
|
|
|
|
|
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|
|
|
Title: |
Bob Ward Companies |
|
Start Date: |
July 2006 |
|
End Date: |
December 2007 |
|
Builder: |
Bob Ward Companies |
|
Description: |
The builder successfully incorporated many high performance features into a standard home design. All of the trade contractors were required to make some changes to their standard practice and achieved a new level of experience through the project. Solar technologies, uncommon in this new-home market, were designed and installed to complement the house model. |
|
Technologies Evaluated: |
-
This project focused on overall energy efficiency performance, and utilized the following technologies:
|
-
Advanced Framing Techniques: Optimum Value Engineering (OVE)
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
-
HVAC Equipment and Duct Installation within Conditioned Space
|
-
Insulation Alternatives: Blown or Foamed Through a Membrane
|
|
|
-
Precast Concrete Foundation and Wall Panels
|
|
|
|
|
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|
Title: |
K. Hovnanian Inc. |
|
Start Date: |
November 1999 |
|
End Date: |
January 2002 |
|
Builder: |
K. Hovnanian |
|
Description: |
Field Evaluation of these technologies: TradeReady® Steel Floor Joists, Frost Protected Shallow Foundations (FPSF), Decorative Concrete Floor Finish, HVAC Equipment and Duct Installation within Conditioned Space, PEX Plumbing Pipes, Prefabricated Drywall Corners. Final Report (dated January 2002) available as pdf. |
|
Technologies Evaluated: |
|
|
-
Frost-Protected Shallow Foundations (FPSF)
|
|
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
-
HVAC Equipment and Duct Installation within Conditioned Space
|
-
Drywall Finishing Accessories
|
|
|
|
Title: |
Model reMODEL |
|
Start Date: |
May 1999 |
|
End Date: |
July 2000 |
|
Builder: |
Owner/Contractor: Mark Wade, Remodeler: John Fries, Project Manager: Bill Asdal. |
|
Description: |
This field evaluation measured the cost for materials and labor for the selected technologies: Kitchen Recycling Center, Latex Foam Sealant, Flexible Gas Piping, Recycled Wood/Plastic Composite Lumber, Plastic Plumbing Manifold and Piping System, Prefinished Drywall Corners, Low-VOC Paint. Final report (dated July 2000) available as pdf. |
|
Technologies Evaluated: |
|
|
|
|
-
Recycled Wood/Plastic Composite Lumber
|
-
Drywall Finishing Accessories
|
|
|
|
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
|
Title: |
Oakwood Homes |
|
Start Date: |
July 2000 |
|
End Date: |
April 2002 |
|
Builder: |
Oakwood Homes of Denver |
|
Description: |
Field Evaluation included construction techniques; installation costs; regulatory compliance issues; thermal performance, energy efficiency, durability, and market reaction. Interim Report available as pdf. |
|
Technologies Evaluated: |
-
Frost-Protected Shallow Foundations (FPSF)
|
|
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
|
|
|
|
|
Title: |
Brighton Construction - Liberty Village |
|
Start Date: |
June 2005 |
|
Estimated Completion Date |
December 2006 |
|
Builder: |
Brighton Construction |
|
Description: |
Field Evaluation of these technologies: ENERGY STAR®, Plastic Plumbing Manifolds, Low Flow Fixtures, Pervious Concrete Pavement, Smart Vapor Retarders and Air Admittance Valves (AAVs) |
|
Technologies Evaluated: |
|
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
-
Low Flow Plumbing Fixtures
|
-
Advanced Framing Techniques: Optimum Value Engineering (OVE)
|
|
|
-
HVAC Equipment and Duct Installation within Conditioned Space
|
|
|
|
Title: |
Weingarten House |
|
Start Date: |
September 2004 |
|
Estimated Completion Date |
August 2006 |
|
Builder: |
Howard Weingarten |
|
Description: |
Field Evaluation of these technologies: Geothermal Heat Pump, Radiant Floor Heating and Cooling, Solar Water Heaters, Soy-based Foam Board Insulation, and Terra Brick. |
|
Technologies Evaluated: |
-
Radiant Floor Heating - Dry System Hydronic
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
-
Soy-based Foam Board Insulation
|
|
|
|
|
|