Matching Field Evaluations
|
Title: |
Lancaster County Career & Technology Center (LCCTC) |
|
Start Date: |
December 2005 |
|
Estimated Completion Date |
June 2009 |
|
Builder: |
Lancaster County Career & Technology Center (LCCTC) |
|
Description: |
Built by students, with a focus on green building and PATH Technology items. |
|
Technologies Evaluated: |
-
Advanced Framing Techniques: Optimum Value Engineering (OVE)
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
|
|
-
Insulating Concrete Forms (ICF)
|
-
Insulation Alternatives: Sprayed Fiber Insulation
|
|
|
|
|
|
|
|
|
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|
|
|
Title: |
Bob Ward Companies |
|
Start Date: |
July 2006 |
|
End Date: |
December 2007 |
|
Builder: |
Bob Ward Companies |
|
Description: |
The builder successfully incorporated many high performance features into a standard home design. All of the trade contractors were required to make some changes to their standard practice and achieved a new level of experience through the project. Solar technologies, uncommon in this new-home market, were designed and installed to complement the house model. |
|
Technologies Evaluated: |
-
This project focused on overall energy efficiency performance, and utilized the following technologies:
|
-
Advanced Framing Techniques: Optimum Value Engineering (OVE)
|
-
Cross-Linked Polyethylene (PEX) Water Supply Piping
|
|
|
-
HVAC Equipment and Duct Installation within Conditioned Space
|
-
Insulation Alternatives: Blown or Foamed Through a Membrane
|
|
|
-
Precast Concrete Foundation and Wall Panels
|
|
|
|
|
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|
Title: |
Farnham Construction |
|
Start Date: |
August 2002 |
|
End Date: |
July 2005 |
|
Builder: |
Farnham Construction, Custom Home Builder |
|
Description: |
Field Evaluation of these technologies: Radiant Heat System and Forced Air System compared. CO2 Controlled Ventilation System. Press Release (date Feb 2003) and Interim Report (dated September 2002) available. |
|
Technologies Evaluated: |
-
Radiant Floor Heating - Dry System Hydronic
|
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|
Title: |
Davis Construction |
|
Start Date: |
May 1999 |
|
End Date: |
September 2002 |
|
Builder: |
Bruce Davis, Inc. |
|
Description: |
Field Evaluation of these technologies: Fiber-Cement Siding, Insulating Concrete Form (ICF) Walls, Tankless Water Heater, Tubular Skylights, Mechanical Ventilation. Final Report (September 2002) available as pdf. |
|
Technologies Evaluated: |
-
Insulating Concrete Forms (ICF)
|
|
|
|
|
|
|
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|
Title: |
South Chicago Workforce |
|
Start Date: |
March 2003 |
|
End Date: |
March 2006 |
|
Builder: |
South Chicago Workforce |
|
Description: |
This field evaluation evaluated three ventilation systems in three identical homes for their effectiveness at distributing fresh air, energy consumption, and operating cost |
|
Technologies Evaluated: |
-
Whole-House Mechanical Ventilation Strategies
|
|
|
|