August 6, 2008

Joists in place, ready for floor sheathing.

Joists in place, ready for floor sheathing.

The raised wood deck has been completed.

The raised wood deck has been completed.


August 4, 2008

The footing is being poured for lot 38 at the Woodlands.

The footing is being poured for lot 38 at the Woodlands.

The raised foundation from the front.

The raised foundation from the front. Note that there are approximately three courses of block in the front wall and seven in the rear, indicating a topography change of approximately 32 inches from front to back.