Title: Lancaster County Career & Technology Center (LCCTC)
Start Date: December 2005
Estimated Completion Date June 2009
Builder: Lancaster County Career & Technology Center (LCCTC)
Description: Built by students, with a focus on green building and PATH Technology items.
Technologies Evaluated:
  • Advanced Framing Techniques: Optimum Value Engineering (OVE)
  • Cross-Linked Polyethylene (PEX) Water Supply Piping
  • Fiber-Cement Siding
  • Fly Ash Concrete
  • Insulating Concrete Forms (ICF)
  • Insulation Alternatives: Sprayed Fiber Insulation
  • Permeable Pavement
  • Rainwater Harvesting
  • Solar Water Heaters
  • Tubular Skylights
  • Whole-House Mechanical Ventilation Strategies
  • Xeriscaping
Title: Bob Ward Companies
Start Date: July 2006
End Date: December 2007
Builder: Bob Ward Companies
Description: The builder successfully incorporated many high performance features into a standard home design. All of the trade contractors were required to make some changes to their standard practice and achieved a new level of experience through the project. Solar technologies, uncommon in this new-home market, were designed and installed to complement the house model.
Technologies Evaluated:
  • This project focused on overall energy efficiency performance, and utilized the following technologies:
  • Advanced Framing Techniques: Optimum Value Engineering (OVE)
  • Cross-Linked Polyethylene (PEX) Water Supply Piping
  • High Performance Glazing
  • HVAC Equipment and Duct Installation within Conditioned Space
  • Insulation Alternatives: Blown or Foamed Through a Membrane
  • Photovoltaic Systems
  • Precast Concrete Foundation and Wall Panels
  • Solar Water Heaters
  • Tankless Water Heaters
  • Whole-House Mechanical Ventilation Strategies
Title: Brighton Construction - Liberty Village
Start Date: June 2005
Estimated Completion Date December 2006
Builder: Brighton Construction
Description: Field Evaluation of these technologies: ENERGY STAR®, Plastic Plumbing Manifolds, Low Flow Fixtures, Pervious Concrete Pavement, Smart Vapor Retarders and Air Admittance Valves (AAVs)
Technologies Evaluated:
  • Plumbing Manifolds
  • Cross-Linked Polyethylene (PEX) Water Supply Piping
  • Low Flow Plumbing Fixtures
  • Advanced Framing Techniques: Optimum Value Engineering (OVE)
  • Smart Vapor Retarders
  • HVAC Equipment and Duct Installation within Conditioned Space
Title: Habitat for Humanity - Arundel
Start Date: April 2003
End Date: October 2003
Builder: Arundel Habitat for Humanity
Description: Field Evaluation of these technologies: Insulating Concrete Form (ICF) foundation, Fiber-Cement Siding, Ducts in Conditioned Space, Blower Door and Duct Blaster Tests. Final Report (dated October 2003) available as pdf.
Technologies Evaluated:
  • Advanced Framing Techniques: Optimum Value Engineering (OVE)
  • Insulating Concrete Forms (ICF)
  • Pre-painted Fiber-Cement Siding